Project Board (OpenProject-style)

A simplified in-house kanban board for practicing open-source-style PM workflows. Save and share your board.
Ideal for: Learners exploring open-source-style PM workflows as an alternative to commercial tools.

What you'll practice

Start practicing

Project Board (OpenProject-style) is part of Practice Tools. Sign in or create an account, then subscribe for โ‚ฆ4,000/month to unlock it.

๐Ÿ“‹ Lab Instructions

Step-by-step exercises for Project Board (OpenProject-style) - read them here, then practice live in the tool above.

Beginner Level

Last updated: August 9, 2026
# Project Board (OpenProject-style) โ€” Full Lab Series **Tool:** Project Board (OpenProject-style) โ€” in-house kanban simulator **Tool key:** `openproject-pm` **What the simulator actually gives you:** three columns (To Do / In Progress / Done), text-based cards you drag between columns, an "+ Add card" button per column, double-click on a card to delete it, and a "Save This Board as a Project" button that stores your columns + cards under a title you choose. Mechanically it's the same board engine as the ClickUp-style tool โ€” what changes here is the *workflow discipline* you practice on it: OpenProject's open-source-PM heritage leans on an explicit **work breakdown structure (WBS)** โ€” phases, work packages under each phase, and status moving in strict phase order โ€” rather than a loose backlog. Because cards are plain text, this series teaches you to encode WBS information (phase, work-package type, owner) into the card title itself, and to enforce phase-order discipline by hand โ€” a skill that transfers directly to real WBS-driven tools. --- ## Lab 1 (Beginner): Your First Work Breakdown **What you're practicing:** setting up a small work breakdown for a project and moving work through stages the way OpenProject structures it โ€” plus building the habit of comparing PM tool styles rather than treating any one as "the" way to run a project. **Estimated time:** 20โ€“30 minutes **Prerequisites:** none โ€” this is the entry point for the tool. ### Setup 1. Click **Open** to launch the board. You'll see three columns already seeded with a few example cards โ€” leave them for now, you'll replace them shortly. 2. Pick a small project you understand well enough to run start-to-finish. A hobby project works fine. Examples if you're stuck: "Plan a weekend trip," "Launch a personal blog," "Organise a small event." 3. Unlike a flat to-do list, a work breakdown groups tasks under **phases** first. Before adding any cards, sketch 2โ€“3 phases for your project on paper, e.g. "Planning," "Execution," "Wrap-up." ### Step-by-step 1. **Clear the sample cards.** Double-click each seeded card and confirm deletion. Start from an empty board. 2. **Set up a small work breakdown.** Create 6โ€“10 tasks total, spread across your 2โ€“3 phases. Give each card a phase prefix so the breakdown is visible in the title itself, e.g.: `[Planning] Book venue` 3. **Group tasks by phase mentally as you add them**, even though the board only has three status columns (To Do / In Progress / Done), not phase columns. This is the core adjustment from a flat backlog: phase is a property of the *work*, status is a property of *where it stands right now* โ€” the two are different axes, and OpenProject-style tools keep them separate on purpose. 4. **Move work through the stages the way OpenProject structures it.** Advance a couple of Planning-phase tasks into "In Progress" and then "Done," working roughly in phase order โ€” don't jump ahead to Execution-phase tasks yet. This single habit โ€” respecting phase order โ€” is the main thing distinguishing this lab from a plain kanban exercise. 5. **Watch for pile-up.** After a few moves, note which column has the most cards. Write one sentence on why you think work is stalling there. 6. **Compare this workflow to a plain kanban board.** If you've used the ClickUp-style Project Board tool, think back to it (or imagine a simple backlog board if you haven't). What's different in how work is organised here versus there? Write 1โ€“2 sentences โ€” this comparison habit is worth building from Lab 1, not saved for later. 7. **Save your board.** Click **Save This Board as a Project** and give it a specific, descriptive title (e.g. "Weekend Trip โ€” Work Breakdown v1"). ### Reflection (write 2โ€“3 sentences) - Which column ended up with the most cards, and why? - What's one concrete difference you noticed between organising work by phase-first versus a flat backlog? ### Success checklist - [ ] Board has 6โ€“10 tasks grouped into 2โ€“3 labeled phases - [ ] Tasks were moved roughly in phase order, not scattered - [ ] One sentence written comparing this workflow to a plain kanban/backlog style - [ ] Board saved with a specific, descriptive title **Tip:** try running the same fictional project through both PM-style boards in this section (this one and the ClickUp-style one) if you have access to both โ€” noticing the differences hands-on is the real learning here, more than reading about them would be. --- ## Lab 2 (Intermediate): A Multi-Phase Work Breakdown **What you're practicing:** running a fuller work breakdown structure โ€” at least 3 phases with several work packages each โ€” while enforcing phase order by hand and catching an oversized task before it causes problems. **Estimated time:** 35โ€“45 minutes **Prerequisites:** Lab 1 (or comparable familiarity with the board's drag/drop and add/delete mechanics). ### Setup 1. Click **Open** to launch a fresh board (or reopen your Lab 1 project if the tool allows continuing it). 2. Choose a project big enough to have **at least 3 phases**. Examples: a website relaunch (Discovery โ†’ Build โ†’ Launch), an event (Planning โ†’ Execution โ†’ Wrap-up), a home renovation (Design โ†’ Construction โ†’ Finishing). 3. Fix a title convention before adding any cards: `[Phase] Work package name โ€” Owner: X` ### Step-by-step 1. **Set up a work breakdown with at least 3 phases and 3โ€“4 tasks per phase.** That's 9โ€“12 work packages total. Write the full breakdown out before touching the board โ€” real WBS work is scoped up front, not discovered by dragging cards. 2. **Add every task to the board using your title convention.** Example: `[Build] Set up CMS โ€” Owner: Ade` 3. **Move tasks through stages in phase order, keeping later-phase tasks parked.** Don't move any Phase 2 or Phase 3 card into "In Progress" until the Phase 1 cards you consider load-bearing are "Done." This is the discipline OpenProject-style planning is built around: work doesn't start just because someone's free โ€” it starts because its phase is actually ready. 4. **Advance the board in at least 3 separate rounds**, not one big pass โ€” move a few cards, pause, move a few more, as if simulating separate days or check-ins. 5. **Note one task that turns out bigger than expected once you start it.** This should happen naturally if you're being honest about scope โ€” pick a card that's been "In Progress" a while and treat it as if it's dragging. 6. **Split that oversized task into two smaller ones instead of leaving it oversized.** Delete the original card and add two more specific replacements. Splitting the moment you notice it's too big โ€” not weeks later โ€” is the habit worth over-practicing: a task that's been "in progress" for way too long is almost always secretly two or three tasks. 7. **Compare this workflow's structure to the ClickUp-style board again.** Write one sentence on when you'd choose one style over the other for a real team โ€” phase-gated WBS discipline versus a looser backlog-and-priority approach. 8. **Save your board** with a title reflecting the multi-phase version, e.g. "Website Relaunch โ€” Work Breakdown v2." ### Reflection (write 3โ€“4 sentences) - Which Phase 1 tasks did you treat as "load-bearing" enough to gate Phase 2 โ€” would a real team agree those were the right ones? - What tipped you off that the task you split was actually oversized? Was it obvious, or did you have to look for it? - When would you personally reach for this phase-gated style over a looser backlog board, and when would the opposite be true? ### Success checklist - [ ] At least 9 work packages across 3 clearly labeled phases - [ ] Later-phase tasks were kept parked until earlier-phase load-bearing tasks were Done - [ ] Board was advanced in at least 3 separate rounds, not one pass - [ ] One oversized task was identified and split into two - [ ] One sentence written comparing this workflow to the ClickUp-style board - [ ] Board saved with a phase-aware title **Tip:** splitting an oversized task the moment you notice it's too big is a habit worth over-practicing โ€” a task that's been "in progress" for way too long is almost always secretly two or three tasks. --- ## Lab 3 (Expert): Full Project Simulation **What you're practicing:** running a complete project end to end and reflecting on the *workflow itself*, not just the tasks โ€” the habit that separates someone who can fill out a board from someone who can actually judge whether a workflow fits a team. **Estimated time:** 45โ€“60 minutes **Prerequisites:** Lab 2 (this lab assumes comfort with phase-gated work breakdowns; a fresh board is fine if you'd rather not reuse Lab 2's). ### Setup 1. Open a fresh board, or continue your Lab 2 project if you'd like to see it through to completion. 2. This lab has no separate written deliverable required beyond a short reflection โ€” the emphasis is on running the *entire* project, start to finish, and paying attention to friction as you go. 3. Keep a scratch note (paper, notes app, or a spare card you delete before saving) for jotting friction points as they happen โ€” don't try to remember them all at the end. ### Step-by-step 1. **Build a full work breakdown covering the whole project.** At least 3 phases, 3+ work packages each, using your `[Phase] Task โ€” Owner: X` convention from Lab 2. 2. **Build and run a full project from empty board to fully Done, across all its phases.** This means every single card ends in "Done" by the end of the lab โ€” not a snapshot at the midpoint, the entire thing, phase-gated the whole way (don't skip the discipline from Lab 2 just because you're rushing to finish). 3. **Keep brief notes on any point where the workflow felt clunky or a task didn't fit neatly into a stage.** Concrete examples to watch for: a task that's really a milestone, not a work package; a task that belongs to two phases at once; a status that doesn't map cleanly to To Do / In Progress / Done (e.g. "waiting on approval" isn't really any of the three). Write these down the moment you notice them, in the moment โ€” not reconstructed afterward. 4. **Deliberately run into at least one of these friction points on purpose if none occur naturally.** For example, add a milestone-style card ("Design approved") and notice it doesn't behave like a normal task โ€” it's binary and instant, not something that sits "In Progress" for days. This is a genuine limitation of a 3-column board that a real WBS tool would model differently (with explicit milestone types). 5. **Move every phase through to Done**, maintaining phase-gate discipline throughout โ€” don't let the pressure to finish the exercise tempt you into skipping the gating you practiced in Lab 2. 6. **Write a short reflection: what would you change about this workflow if you were setting it up for a real team?** Be specific โ€” not "make it better," but a concrete change, e.g. "I'd add a fourth column for 'Blocked' because two of my tasks needed one and I had to fake it with the card title instead." 7. **Compare your finished project to your Lab 2 ClickUp-style project, if you did that lab.** Which one would you actually recommend to a small team, and why? If you haven't done the ClickUp-style labs, compare instead to a plain flat to-do list you've used in real life. 8. **Save your finished board and reflection as your final project for this tool.** If there's no dedicated field for the written reflection, paste it into the board as a final card before saving, or keep it as a companion note alongside your project title. ### Reflection (write 3โ€“5 sentences โ€” this is the actual deliverable of the lab) - What would you change about this workflow if you were setting it up for a real team? Name one concrete change. - Which friction point taught you the most โ€” a naturally occurring one, or the one you deliberately engineered? - Which PM-style board (this one, or an alternative) would you actually recommend to a small team, and why? ### Success checklist - [ ] Full work breakdown built and run from empty board to every card in Done - [ ] Phase-gate discipline maintained the entire way through, not abandoned near the end - [ ] At least one friction point identified and noted at the moment it happened - [ ] One friction point deliberately engineered if none occurred naturally - [ ] Concrete (not vague) written reflection on what you'd change about the workflow - [ ] One comparison sentence against another PM-style board or a real to-do list - [ ] Final board + reflection saved together **Tip:** the "right" PM tool or workflow is the one your specific team will actually keep using โ€” practicing noticing friction points is more valuable long-term than memorising any one tool's ideal setup. A workflow that looks correct on a whiteboard but that nobody follows in practice isn't actually working. --- ## Quick reference: title conventions used across this series | Element | Convention | Example | |---|---|---| | Phase | `[Phase Name]` prefix | `[Build]` | | Owner | `โ€” Owner: Name` | `โ€” Owner: Ade` | | Milestone (Lab 3 only) | treat as its own card, note that it behaves differently | `[Launch] Design approved (milestone)` | Since the simulator only stores plain-text card titles and has no native phase or work-package fields, consistency in how you encode this information โ€” and discipline in respecting phase order when you move cards โ€” is itself the core skill this series builds. A "work breakdown" that isn't actually respected in what gets moved when is just a backlog with extra labels.

Intermediate Level

Last updated: August 9, 2026
Lab 2 (Intermediate) โ€” Project Board (OpenProject-style)
๐Ÿ—‚๏ธ Project Board (OpenProject-style) Intermediate ยท Lab 2

A Multi-Phase Work Breakdown

Building on Lab 1: you moved a small breakdown through the stages once. Now build something closer to a real open-source-style project โ€” phase-gated, deliberately paced, and honest about scope creep.

~35โ€“45 minestimated time
Lab 1prerequisite
9โ€“12 packagesacross 3 phases

Setup Before you open the board

A work breakdown is scoped before it's built. Decide on phases and a title convention first.

1Pick a project with real phases

Choose something big enough to have at least 3 phases. Examples: a website relaunch (Discovery โ†’ Build โ†’ Launch), an event (Planning โ†’ Execution โ†’ Wrap-up), a home renovation (Design โ†’ Construction โ†’ Finishing).

2Fix a title convention up front

The board only stores plain-text card titles โ€” no native phase or owner fields โ€” so agree on a format before adding a single card:

[Phase] Work package name โ€” Owner: X

Build Populate and run the breakdown

Scope the whole breakdown before touching the tool, then bring it in and respect phase order as you run it.

3Set up a work breakdown with 3+ phases, 3โ€“4 tasks each

That's 9โ€“12 work packages total. Write the full breakdown out before touching the board โ€” real WBS work is scoped up front, not discovered by dragging cards.

4Add every task using your convention

Example: [Build] Set up CMS โ€” Owner: Ade

[Planning] [Build] [Launch]
5Move tasks through stages in phase order

Keep later-phase tasks parked โ€” don't move any Phase 2 or Phase 3 card into "In Progress" until the Phase 1 cards you consider load-bearing are "Done." Work doesn't start just because someone's free โ€” it starts because its phase is actually ready.

6Advance the board in at least 3 separate rounds

Not one big pass โ€” move a few cards, pause, move a few more, as if simulating separate days or check-ins.

7Note one task that turns out bigger than expected

This should happen naturally if you're honest about scope โ€” pick a card that's been "In Progress" a while and treat it as if it's dragging.

scope watch
8Split it into two smaller tasks

Delete the original card and add two more specific replacements instead of leaving it oversized. Splitting the moment you notice it โ€” not weeks later โ€” is the habit worth over-practicing.

9Compare this workflow's structure to the ClickUp-style board again

Write one sentence on when you'd choose one style over the other for a real team โ€” phase-gated WBS discipline versus a looser backlog-and-priority approach.

10Save your board

Use a title reflecting the multi-phase version, e.g. Website Relaunch โ€” Work Breakdown v2.

Reflect Write 3โ€“4 sentences

Reflection prompts

  • Which Phase 1 tasks did you treat as "load-bearing" enough to gate Phase 2 โ€” would a real team agree those were the right ones?
  • What tipped you off that the task you split was actually oversized? Was it obvious, or did you have to look for it?
  • When would you personally reach for this phase-gated style over a looser backlog board, and when would the opposite be true?

โœ“ Success checklist

  • At least 9 work packages across 3 clearly labeled phases
  • Later-phase tasks were kept parked until earlier-phase load-bearing tasks were Done
  • Board was advanced in at least 3 separate rounds, not one pass
  • One oversized task was identified and split into two
  • One sentence written comparing this workflow to the ClickUp-style board
  • Board saved with a phase-aware title

Tip: splitting an oversized task the moment you notice it's too big is a habit worth over-practicing โ€” a task that's been "in progress" for way too long is almost always secretly two or three tasks.

Ref Title convention quick reference

ElementConventionExample
Phase[Phase Name] prefix[Build]
Ownerโ€” Owner: Nameโ€” Owner: Ade
Project Board (OpenProject-style) ยท Practice Sandbox โ€” Lab 2 of 3

Expert Level

Last updated: August 9, 2026
Lab 2 (Intermediate) โ€” Project Board (OpenProject-style)
๐Ÿ—‚๏ธ Project Board (OpenProject-style) Intermediate ยท Lab 2

A Multi-Phase Work Breakdown

Building on Lab 1: you moved a small breakdown through the stages once. Now build something closer to a real open-source-style project โ€” phase-gated, deliberately paced, and honest about scope creep.

~35โ€“45 minestimated time
Lab 1prerequisite
9โ€“12 packagesacross 3 phases

Setup Before you open the board

A work breakdown is scoped before it's built. Decide on phases and a title convention first.

1Pick a project with real phases

Choose something big enough to have at least 3 phases. Examples: a website relaunch (Discovery โ†’ Build โ†’ Launch), an event (Planning โ†’ Execution โ†’ Wrap-up), a home renovation (Design โ†’ Construction โ†’ Finishing).

2Fix a title convention up front

The board only stores plain-text card titles โ€” no native phase or owner fields โ€” so agree on a format before adding a single card:

[Phase] Work package name โ€” Owner: X

Build Populate and run the breakdown

Scope the whole breakdown before touching the tool, then bring it in and respect phase order as you run it.

3Set up a work breakdown with 3+ phases, 3โ€“4 tasks each

That's 9โ€“12 work packages total. Write the full breakdown out before touching the board โ€” real WBS work is scoped up front, not discovered by dragging cards.

4Add every task using your convention

Example: [Build] Set up CMS โ€” Owner: Ade

[Planning] [Build] [Launch]
5Move tasks through stages in phase order

Keep later-phase tasks parked โ€” don't move any Phase 2 or Phase 3 card into "In Progress" until the Phase 1 cards you consider load-bearing are "Done." Work doesn't start just because someone's free โ€” it starts because its phase is actually ready.

6Advance the board in at least 3 separate rounds

Not one big pass โ€” move a few cards, pause, move a few more, as if simulating separate days or check-ins.

7Note one task that turns out bigger than expected

This should happen naturally if you're honest about scope โ€” pick a card that's been "In Progress" a while and treat it as if it's dragging.

scope watch
8Split it into two smaller tasks

Delete the original card and add two more specific replacements instead of leaving it oversized. Splitting the moment you notice it โ€” not weeks later โ€” is the habit worth over-practicing.

9Compare this workflow's structure to the ClickUp-style board again

Write one sentence on when you'd choose one style over the other for a real team โ€” phase-gated WBS discipline versus a looser backlog-and-priority approach.

10Save your board

Use a title reflecting the multi-phase version, e.g. Website Relaunch โ€” Work Breakdown v2.

Reflect Write 3โ€“4 sentences

Reflection prompts

  • Which Phase 1 tasks did you treat as "load-bearing" enough to gate Phase 2 โ€” would a real team agree those were the right ones?
  • What tipped you off that the task you split was actually oversized? Was it obvious, or did you have to look for it?
  • When would you personally reach for this phase-gated style over a looser backlog board, and when would the opposite be true?

โœ“ Success checklist

  • At least 9 work packages across 3 clearly labeled phases
  • Later-phase tasks were kept parked until earlier-phase load-bearing tasks were Done
  • Board was advanced in at least 3 separate rounds, not one pass
  • One oversized task was identified and split into two
  • One sentence written comparing this workflow to the ClickUp-style board
  • Board saved with a phase-aware title

Tip: splitting an oversized task the moment you notice it's too big is a habit worth over-practicing โ€” a task that's been "in progress" for way too long is almost always secretly two or three tasks.

Ref Title convention quick reference

ElementConventionExample
Phase[Phase Name] prefix[Build]
Ownerโ€” Owner: Nameโ€” Owner: Ade