Activity Dependencies For Projects: The Various Types (+Examples)

 

 

In my previous article, I talked about some of the facts that you need to know about work breakdown Structure for projects. In this article, I want to talk about some of the facts that you need to know about activity dependencies for projects. Follow me as we will look at that together in this article.

 

 

You are the project manager for the launching of a new product line. if you do not understand the sequence in which the project work must occur, you cannot develop an effective schedule. You will end up with rework and additional costs.

 

 

Creating a project schedule network diagram for your project will help you uncover the relationship between risks, and avoid unnecessary work and expense.

 

 

Activity Dependencies

An activity dependency for projects is a logical relationship that exists between two project activities.

 

The relationship indicates whether the start of an activity is contingent upon an event or input from outside activity.

 

 

Activity Dependencies

An activity dependency is a logical relationship that exists between two project activities.

 

 

 

 

The relationship indicates whether the start of an activity is contingent upon an event or inputs from outside the activity.

 

 

Activity Dependencies shape the sequence of project activities.

 

 

Typical example…

An architect, Brian, designed a residence and has a vision for room layouts.

 

However, he will not be able to assess the functionality of the design until the builders frame the structure with walls, windows and a roof.

 

Once the structure is in place, he will be able to reassess the plan to determine if modifications are necessary.

 

 

#1 Mandatory

A mandatory dependency is inherent to the work itself. It is usually affected by physical constraints. Activities must be performed in a specific sequence for the work to be successful. Mandatory is also known as “hard logic”.

 

#2 Discretionary

A discretionary dependency is defined by the project and the project management team at their discretion. It is defined based on the best practices followed in a specific application area or on specific requirements.

 

If there is no mandatory or external dependency between two activities, the team has some flexibility in activity sequencing.

 

 

It is also known as “soft logic”, “preferential logic” and “preferred logic”.

 

 

For example, the sponsor will like to see the book’s cover design as soon as possible, so the team may decide to have the cover artwork done before the inside illustration.

 

 

#3 External

An external dependency is contingent on inputs from outside the project activities.

 

 

An example is a book that can’t be printed until the shipment of paper arrives.

To Get Email Updates when we post new content, Click Here.

Related Posts

Change Control Board: What You Should Know...
In my previous article, I looked at all that you...
Read more
Understanding Network Representation For Networks
Network architects and administrators must be able to show what...
Read more
Why You Should Vote Fashina Oluyemi For...
    https://youtu.be/Ao1u2A3NgG4 On the election day, make sure you vote for AAC....
Read more
Day 12: MFM 2021 70 Days Fasting...
  Devotional Songs Praise and Worship. Prayers of Praise and thanksgiving   29. Powers using...
Read more
Organisation Culture And Styles : How It...
  In my previous article, I looked at some of the...
Read more

Post does not have featured image

An Insight Into The Activity Of Cybercriminals
In my previous article, I have mentioned that cybercriminals are...
Read more
The Glory Of The Youth. RCCG Sunday...
  Memory Verse: "The glory of young men is their strength,...
Read more
Day 45: 2023 MFM 70 Days Fasting...
Day 45: 2023 MFM 70 Days Fasting and Prayers   Devotional Songs Praise...
Read more