Activity Dependencies For Projects: The Various Types (+Examples)

 

 

In my previous article, I talked about some of the facts that you need to know about work breakdown Structure for projects. In this article, I want to talk about some of the facts that you need to know about activity dependencies for projects. Follow me as we will look at that together in this article.

 

 

You are the project manager for the launching of a new product line. if you do not understand the sequence in which the project work must occur, you cannot develop an effective schedule. You will end up with rework and additional costs.

 

 

Creating a project schedule network diagram for your project will help you uncover the relationship between risks, and avoid unnecessary work and expense.

 

 

Activity Dependencies

An activity dependency for projects is a logical relationship that exists between two project activities.

 

The relationship indicates whether the start of an activity is contingent upon an event or input from outside activity.

 

 

Activity Dependencies

An activity dependency is a logical relationship that exists between two project activities.

 

 

 

 

The relationship indicates whether the start of an activity is contingent upon an event or inputs from outside the activity.

 

 

Activity Dependencies shape the sequence of project activities.

 

 

Typical example…

An architect, Brian, designed a residence and has a vision for room layouts.

 

However, he will not be able to assess the functionality of the design until the builders frame the structure with walls, windows and a roof.

 

Once the structure is in place, he will be able to reassess the plan to determine if modifications are necessary.

 

 

#1 Mandatory

A mandatory dependency is inherent to the work itself. It is usually affected by physical constraints. Activities must be performed in a specific sequence for the work to be successful. Mandatory is also known as “hard logic”.

 

#2 Discretionary

A discretionary dependency is defined by the project and the project management team at their discretion. It is defined based on the best practices followed in a specific application area or on specific requirements.

 

If there is no mandatory or external dependency between two activities, the team has some flexibility in activity sequencing.

 

 

It is also known as “soft logic”, “preferential logic” and “preferred logic”.

 

 

For example, the sponsor will like to see the book’s cover design as soon as possible, so the team may decide to have the cover artwork done before the inside illustration.

 

 

#3 External

An external dependency is contingent on inputs from outside the project activities.

 

 

An example is a book that can’t be printed until the shipment of paper arrives.

To Get Email Updates when we post new content, Click Here.

Related Posts

Customer In CRM: Real Reasons Why You...
  At the end of this article , readers should be...
Read more
Lord Of The Harvest. AG Sunday School...
*Memory Verse: Matthew 9:37, 38*   ________________________ _The harvest is truly pretentious, but...
Read more
Passion For Lost Souls. RCCG House Fellowship.
    OPENING PRAYER: Father, please make me a passionate soul winner. PREVIOUS KNOWLEDGE: The...
Read more
Christian Virtues. RCCG Sunday School Teachers
  SUNDAY SCHOOL HYMN 1. O Sunday School, on the Lord’s day, O...
Read more
10 Stages Of Web Analytics Process For...
In my previous article, I tried to look at some...
Read more
The Saviour Is Born. AG Adult Sunday...
  THE SAVIOUR IS BORN (CHRISTMAS)     Memory Verse: Luke 2: 11 For unto...
Read more
End Time Prophecies. RCCG Sunday School Manual.
  End Time Prophecies. RCCG Sunday School Manual.     Opening Prayer:  Father, help...
Read more
Ready For Tough Times. AG Teen Sunday...
Ready For Tough Times. AG Teen Sunday School Manual     TEXT: 41...
Read more