Activity Dependencies For Projects: Guaranteeing Project Coordination

Activity Dependencies For Projects

 

Activity Dependencies For Projects: Practical Ways Of Guaranteeing Project Coordination.

 

In my previous article, I talked about some of the facts that you need to know about work breakdown Structure for projects. In this article, I want to talk about some of the facts that you need to know about activity dependencies for projects. Follow me as we will look at that together in this article.

 

 

You are the project manager for the launching of a new product line. if you do not understand the sequence in which the project work must occur, you cannot develop an effective schedule. You will end up with rework and additional costs.

 

4 Types Of Activity Dependencies For Projects

 

 

In my previous article, I talked about some of the facts that you need to know about work breakdown Structure for projects. In this article, I want to talk about some of the facts that you need to know about activity dependencies for projects. Follow me as we will look at that together in this article.

 

 

You are the project manager for the launching of a new product line. if you do not understand the sequence in which the project work must occur, you cannot develop an effective schedule. You will end up with rework and additional costs.

 

 

Creating a project schedule network diagram for your project will help you uncover the relationship between risks, and avoid unnecessary work and expense.

 

 

Activity Dependencies

An activity dependency for projects is a logical relationship that exists between two project activities.

 

The relationship indicates whether the start of an activity is contingent upon an event or input from outside activity.

 

 

Activity Dependencies

An activity dependency is a logical relationship that exists between two project activities.

 

The relationship indicates whether the start of an activity is contingent upon an event or inputs from outside the activity.

 

 

Activity Dependencies shape the sequence of project activities.

 

 

Typical example…

An architect, Brian, designed a residence and has a vision for room layouts.

 

However, he will not be able to assess the functionality of the design until the builders frame the structure with walls, windows and a roof.

 

Once the structure is in place, he will be able to reassess the plan to determine if modifications are necessary.

 

 

#1 Mandatory

A mandatory dependency is inherent to the work itself. It is usually affected by physical constraints. Activities must be performed in a specific sequence for the work to be successful. Mandatory is also known as “hard logic”.

 

#2 Discretionary

A discretionary dependency is defined by the project and the project management team at their discretion. It is defined based on the best practices followed in a specific application area or on specific requirements.

 

If there is no mandatory or external dependency between two activities, the team has some flexibility in activity sequencing.

 

 

It is also known as “soft logic”, “preferential logic” and “preferred logic”.

 

 

For example, the sponsor will like to see the book’s cover design as soon as possible, so the team may decide to have the cover artwork done before the inside illustration.

 

 

#3 External

An external dependency is contingent on inputs from outside the project activities.

 

 

An example is a book that can’t be printed until the shipment of paper arrives.

 

Action Point
PS: If you would like to have an online course on any of the courses that you found on this blog, I will be glad to do that on individual and corporate levels, I will be very glad to do that I have trained several individuals and groups. They are doing well in their various fields of endeavour. Some of those that I have trained include staff of Dangote Refinery, FCMB, Zenith Bank, and New Horizons Nigeria among others. Please come on Whatsapp and let’s talk about your trainingYou can reach me on Whatsapp HERE. Please note that I will be using Microsoft Team to facilitate the training.

I know you might agree with some of the points that I have raised in this article. You might not agree with some of the issues raised. Let me know your views about the topic discussed. We will appreciate it if you could drop your comment. Thanks in anticipation.

 

Fact Check Policy

CRMNuggets is committed to fact-checking in a fair, transparent and non-partisan manner. Therefore, if you’ve found an error in any of our reports, be it factual, editorial, or an outdated post, please contact us to tell us about it.

 

Become Part Of our Fan Base on Facebook. Click Here.
Follow Us on Twitter. Click Here.
Many Crypto. One place. Use Roqqu

Hi, I now use RavenBank to send, receive and save money. I also pay my bills with ease, you should try it out too

  
Fact Check Policy
truehost
telegram
CRMNuggets Whatsapp Channel
About Adeniyi Salau 1500 Articles
Adeniyi Salau is a highly dedicated and committed Blogger of repute. He likes sharing his IT knowledge with others. My desire is to impact as many lives as possible with my IT skills. You can download my mobile APP. Download the ICTLOAD APP on Google Playstore. Thanks.

Be the first to comment

Leave a Reply

Your email address will not be published.


*