Activity Dependencies For Projects: The Various Types (+Examples)

4 Types Of Activity Dependencies For Projects

 

 

In my previous article, I talked about some of the facts that you need to know about work breakdown Structure for projects. In this article, I want to talk about some of the facts that you need to know about activity dependencies for projects. Follow me as we will look at that together in this article.

 

 

You are the project manager for the launching of a new product line. if you do not understand the sequence in which the project work must occur, you cannot develop an effective schedule. You will end up with rework and additional costs.

 

 

Creating a project schedule network diagram for your project will help you uncover the relationship between risks, and avoid unnecessary work and expense.

 

 

Activity Dependencies

An activity dependency for projects is a logical relationship that exists between two project activities.

 

The relationship indicates whether the start of an activity is contingent upon an event or input from outside activity.

 

 

Activity Dependencies

An activity dependency is a logical relationship that exists between two project activities.

 

 

 

 

The relationship indicates whether the start of an activity is contingent upon an event or inputs from outside the activity.

 

 

Activity Dependencies shape the sequence of project activities.

 

 

Typical example…

An architect, Brian, designed a residence and has a vision for room layouts.

 

However, he will not be able to assess the functionality of the design until the builders frame the structure with walls, windows and a roof.

PEOPLE ALSO READ:  Communications And Customer Requirements For Projects (+Examples)

 

Once the structure is in place, he will be able to reassess the plan to determine if modifications are necessary.

 

 

#1 Mandatory

A mandatory dependency is inherent to the work itself. It is usually affected by physical constraints. Activities must be performed in a specific sequence for the work to be successful. Mandatory is also known as “hard logic”.

 

#2 Discretionary

A discretionary dependency is defined by the project and the project management team at their discretion. It is defined based on the best practices followed in a specific application area or on specific requirements.

 

If there is no mandatory or external dependency between two activities, the team has some flexibility in activity sequencing.

 

 

It is also known as “soft logic”, “preferential logic” and “preferred logic”.

 

 

For example, the sponsor will like to see the book’s cover design as soon as possible, so the team may decide to have the cover artwork done before the inside illustration.

 

 

#3 External

An external dependency is contingent on inputs from outside the project activities.

 

 

An example is a book that can’t be printed until the shipment of paper arrives.

To Get Email Updates when we post new content, Click Here.

Loading

Related Posts

Search EnginesSearch Engines
Off-Page Optimization In SEO: Practicalising It With...
 
PEOPLE ALSO READ:  Work Breakdown Structure For Projects: Ways Of Managing Projects Successfully
At its heart, off-page optimization is about building backlinks to...
Read more
6 Terms Relating To Schedule Management For Projects6 Terms Relating To Schedule Management For Projects
6 Terms Relating To Schedule Management For...
This article explains some of the terms relating to Schedule...
Read more
Proper Instant Messaging Security MeasuresProper Instant Messaging Security Measures
Video: 13 Specific Factors That Can Lead...
    This video discusses specific factors that can lead to project...
Read more
Tim SouloTim Soulo
Tim Soulo: His Secrets To Success In...
Here are some of the Blogging Success Tips from Tim...
Read more
The Mighty Samson. RCCG Sunday School Manual.The Mighty Samson. RCCG Sunday School Manual.
The Mighty Samson. RCCG Sunday School Manual.
    Memory Verse: For behold , you shall conceive and bear...
Read more
image of a lionimage of a lion
MFM 70 Days Fasting and Prayer 7...
MFM 70 Days Fasting and Prayer 7 August 2024   MFM 2024...
Read more
JBL Flip 5 Waterproof Bluetooth SpeakerJBL Flip 5 Waterproof Bluetooth Speaker
JBL Flip 5 Waterproof Bluetooth Speaker: A...
  One thing that has become part of our life is...
Read more
4 Method Of Data Collection For Web Analysis4 Method Of Data Collection For Web Analysis
Data Collection For Web Analysis: The Various...
  In my previous article, I have talked about some of...
Read more
CRMNuggets Whatsapp Channel
truehost

Adeniyi Salau is a highly dedicated and committed Blogger of repute. He likes sharing his IT knowledge with others. My desire is to impact as many lives as possible with my IT skills. You can download my mobile APP. Download the ICTLOAD APP on Google Playstore. Thanks.

Leave a Reply

Your email address will not be published. Required fields are marked *

Enable Notifications OK No thanks