How To Develop A Work Breakdown Structure For Projects

How To Develop A Work Breakdown Structure For Projects

 

In my previous article, I talked about all that you need to know about work Breakdown Structure for projects. In this article, I want to talk about how to develop a work Breakdown Structure for projects. Follow me as we look at that together in this article.

The guidelines…

#1 Reference material

There is a need for you to gather the reference materials and other inputs you will need. Some of the materials include the scope statement, requirement documentation, a WBS template, constraints and assumptions, constraints and assumptions and other planning inputs that may impact scope definition.

#2 Organisation

You have to determine how you are going to organise the work of your project. Regardless of the organisation, these elements represent the level directly below the project name on your WBS. The WBS can be created using various methods.

Subdividing the project into phases s the first level of decomposition and then subdividing the phases into product and project deliverables is the second level of decomposition.

The project can be subdivided into major deliverables, which can be the first level of decomposition.

Making the subprojects conducted outside the organisation the first level of decomposition and the supporting contract work the second level of decomposition.

#3 Major deliverables

You need to identify the major deliverables or subprojects for the project.

The major deliverables should be listed in the scope statement or contract, but your team may think of more deliverables that are necessary to achieve the project’s objectives.

If you are organising your project work by major deliverables, this step will represent the level directly below the project name.

PEOPLE ALSO READ:  Identifying Resources For Projects: How To Go About It (+Examples)

If you are organising your work by some other method, the major deliverable will probably be two levels below the project name.

#4 Sufficient decomposition

You have to analyse each element to determine whether it is sufficiently decomposed. Can each deliverable be adequately scheduled, budgeted, and assigned to an individual person or group?

If yes, you have reached the work package level; decomposition for this element is complete. Skip the next step and go to step 6. If not, further decomposition is required for this element.

#5 Subdeliverables

Break down each WBS element into Subdeliverables until you reach the work package level. For each element, ask yourself, ” In order to create this deliverable, what Subdeliverables will we have to produce?”. Repeat step 4.

#6 Validate your WBS

There is a need for you to validate your WBS using a bottom-up approach. Starting at the work package level, ensure that:

  • The lower level complaints are necessary and sufficient for the completion of each decomposed item.
  • Each element is described as a deliverable and is distinguishable from all other deliverables.
  • Each element can be adequately budgeted, scheduled, and assigned to an individual person or group.

Remember that, although it is not necessary to have the same number of levels for each deliverable, a disproportionate number of levels may indicate that the deliverable is inappropriately decomposed.

Analyse the element to determine whether one of the high-level components should be broken into two or more Subdeliverables should be combined.

Make the necessary modifications before moving to step 7.

PEOPLE ALSO READ:  Creating Schedule Baseline For Projects: How To Do It (+Examples)

#7 Project code

Using your Organisation’s or project code of accounts, assign a unique numeric cost code for each element, indicating its branch and level on the WBS for cost performance tracking and reporting.

 

 

Fact Check Policy

CRMNuggetsis committed to fact-checking in a fair, transparent, and non-partisan manner. Therefore, if you’ve found an error in any of our reports, be it factual, editorial, or an outdated post, please contact us to tell us about it.

Become Part Of ourFan Base on Facebook. Click Here.
Follow Us on Twitter.Click Here.
Many Crypto. One place. UseRoqqu

Hi, I now use RavenBank to send, receive and save money. I also pay my bills with ease,you should try it out too

OUR MISSION

To create well-reached contents that will increase the intellectual prowess of our readers.

OUR VISION

To become a reference point in the blogging space by the year 2030. We want to be among the first 30 blogs in Nigeria.

Official Social Media Pages for crmnuggets.com

To Get Email Updates when we post new content,Click Here.

Loading

Related Posts

Types Of Search Engine OptimizationTypes Of Search Engine Optimization
Types Of Search Engine Optimization: How To...
 
PEOPLE ALSO READ:  Activity Dependencies For Projects: Guaranteeing Project Coordination
  In this article, I want to highlight the three types of...
Read more
9 Elements Of A Good E-Commerce Website9 Elements Of A Good E-Commerce Website
9 Elements Of A Good E-Commerce Website:...
  In my previous articles, I have talked about some of...
Read more
Church Without Spot Or Wrinkle. RCCG House FellowshipChurch Without Spot Or Wrinkle. RCCG House Fellowship
Church Without Spot Or Wrinkle. RCCG House...
  OPENING PRAYER: Father, help Your Church to stand without spot.   PREVIOUS...
Read more
RCCG SOD Year Three. The Victory Of The DiscipleRCCG SOD Year Three. The Victory Of The Disciple
RCCG SOD Year Three. The Victory Of...
    Everything about a disciple is unusual because he is someone...
Read more
The principles of UX and UI In Web DesignThe principles of UX and UI In Web Design
The principles of UX and UI In...
The principles of UX and UI In Web Design       Some...
Read more
Customer Engagement In Digital StrategyCustomer Engagement In Digital Strategy
Customer Engagement In Digital Strategy: Way Of...
Customer Engagement In Digital Strategy     Customer engagement is often overlooked as...
Read more
Christians And Politics. RCCG Sunday School Manual
    Memory Verse: "When the righteous are in authority, the people...
Read more
Critical Path For ProjectsCritical Path For Projects
Identifying Critical Path For Projects: Removing Obstacles...
Ways Of Identifying The Critical Path For Projects     Sometimes, the resources...
Read more
CRMNuggets Whatsapp Channel
truehost

Adeniyi Salau is a highly dedicated and committed Blogger of repute. He likes sharing his IT knowledge with others. My desire is to impact as many lives as possible with my IT skills. You can download my mobile APP. Download the ICTLOAD APP on Google Playstore. Thanks.

Leave a Reply

Your email address will not be published. Required fields are marked *

Enable Notifications OK No thanks